Triple
T31024859
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MIL-T-38219 |
E790541
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. military technical specification |
C2464
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. military technical specification Context triple: [MIL-T-38219, instanceOf, U.S. military technical specification]
-
A.
military standard
chosen
A military standard is an officially established set of technical, procedural, or quality requirements used by armed forces to ensure compatibility, reliability, and uniformity of equipment, systems, and practices.
-
B.
United States military manual
A United States military manual is an official publication that provides standardized doctrine, procedures, and guidance for the organization, training, and operations of U.S. armed forces.
-
C.
U.S. Department of Defense strategic document
A U.S. Department of Defense strategic document is an official, high-level publication that outlines long-term defense objectives, priorities, and plans for employing military resources to protect national security interests.
-
D.
military-technical authority
A military-technical authority is an entity or individual empowered to make decisions and provide expert guidance on the development, deployment, and regulation of military technologies and related operational capabilities.
-
E.
military aircraft requirement
A military aircraft requirement is a formal, testable specification that defines the necessary capabilities, performance, and constraints an aircraft must meet to fulfill designated military missions and operational needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c811508190a7de096a5b1f5798 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:58 p.m.