Triple

T31008511
Position Surface form Disambiguated ID Type / Status
Subject Elwha Dam E790140 entity
Predicate removalEndDate P65813 FINISHED
Object 2014 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2014 | Statement: [Elwha Dam, removalEndDate, 2014]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: removalEndDate
Context triple: [Elwha Dam, removalEndDate, 2014]
  • A. removalStartDate
    Indicates the date on which the process of removing an entity or item is initiated.
  • B. removalPeriod
    Indicates the time span during which something is taken away, deleted, or otherwise removed from availability or consideration.
  • C. cessationDate
    Indicates the date on which an ongoing state, activity, or relationship comes to an end.
  • D. decommissioningEndDate chosen
    Indicates the date on which a decommissioning process or status for something is completed or officially ends.
  • E. deJureRemovalDate
    Indicates the official, legally recognized date on which an entity is formally removed from a position, status, or record.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c73ca48190a1e46cb58ad4045b completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6b967d5308190bbb66d0a8dd52612 completed May 3, 2026, 2:56 a.m.
PD Predicate disambiguation batch_69f6b6293188819080d5041ca0adb969 completed May 3, 2026, 2:42 a.m.
Created at: April 29, 2026, 8:57 p.m.