Triple

T30992923
Position Surface form Disambiguated ID Type / Status
Subject Bus Fountain E789714 entity
Predicate instanceOf P0 FINISHED
Object kinetic water installation C5162 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: kinetic water installation
Context triple: [Bus Fountain, instanceOf, kinetic water installation]
  • A. man-made waterfall
    A man-made waterfall is an artificial structure designed to mimic the appearance and flow of a natural waterfall, typically created for aesthetic, recreational, or environmental purposes.
  • B. outdoor fountain chosen
    An outdoor fountain is a decorative water feature installed in exterior spaces that circulates or sprays water for aesthetic, ambient, or architectural enhancement.
  • C. water-powered mill
    A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
  • D. water turbine
    A water turbine is a device that converts the kinetic and potential energy of flowing or falling water into mechanical rotational energy, typically used to generate electricity.
  • E. kinetic sculpture race
    A kinetic sculpture race is a human-powered, all-terrain competition where participants pilot artistically engineered, often whimsical moving sculptures across land, water, and other challenging surfaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c65a348190baaed1c01a29900c completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:56 p.m.