Triple

T30981061
Position Surface form Disambiguated ID Type / Status
Subject Golden Gate Ferry connection at Sausalito E789373 entity
Predicate instanceOf P0 FINISHED
Object railway–ferry connection C48167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway–ferry connection
Context triple: [Golden Gate Ferry connection at Sausalito, instanceOf, railway–ferry connection]
  • A. auto ferry train
    An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
  • B. train ferry
    A train ferry is a specialized ship designed to transport railway vehicles and their cargo across bodies of water, allowing trains to roll on and off via onboard tracks.
  • C. transporter bridge ferry
    A transporter bridge ferry is a movable platform suspended from a high-level bridge structure that carries passengers and vehicles across a waterway by traversing along the bridge span.
  • D. ferry crossing chosen
    A ferry crossing is a designated route or location where a ferry transports passengers, vehicles, or goods across a body of water between two points.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c4831c8190be53924ec25a150a completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:55 p.m.