Triple

T30981060
Position Surface form Disambiguated ID Type / Status
Subject Golden Gate Ferry connection at Sausalito E789373 entity
Predicate instanceOf P0 FINISHED
Object intermodal transport terminal C37500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intermodal transport terminal
Context triple: [Golden Gate Ferry connection at Sausalito, instanceOf, intermodal transport terminal]
  • A. intermodal passenger station
    An intermodal passenger station is a transportation facility where travelers can conveniently transfer between multiple modes of passenger transport, such as trains, buses, trams, and sometimes air or ferry services, within a coordinated hub.
  • B. maritime cargo terminal
    A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
  • C. transport terminal chosen
    A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
  • D. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • E. bulk cargo terminal
    A bulk cargo terminal is a specialized port facility designed for the efficient handling, storage, and transfer of unpackaged bulk commodities such as coal, grain, ore, and fertilizers between ships, land transport, and storage areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c4831c8190be53924ec25a150a completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:55 p.m.