Triple
T30980918
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tiburon as a railroad terminus |
E789369
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ferry-rail terminal |
C6402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ferry-rail terminal Context triple: [Tiburon as a railroad terminus, instanceOf, ferry-rail terminal]
-
A.
ferry terminal
chosen
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
B.
transport terminal
A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
-
C.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
-
D.
passenger rail terminal
A passenger rail terminal is a dedicated facility where travelers board, disembark, and transfer between trains, supported by platforms, ticketing, waiting areas, and related passenger services.
-
E.
auto ferry train
An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c4831c8190be53924ec25a150a |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:55 p.m.