Triple
T30980917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tiburon as a railroad terminus |
E789369
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railroad terminus |
C10600
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railroad terminus Context triple: [Tiburon as a railroad terminus, instanceOf, railroad terminus]
-
A.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
-
B.
terminal railroad
A terminal railroad is a short-line or switching railroad that operates within a limited area, typically serving as an interchange point between major railroads and local industries, handling the transfer, classification, and delivery of freight cars.
-
C.
narrow-gauge railway terminus
A narrow-gauge railway terminus is the end station or final stopping point on a railway line that uses tracks of narrower width than the standard gauge, where trains begin or conclude their journeys and related operations are managed.
-
D.
terminal station
chosen
A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
-
E.
railroad depot
A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c4831c8190be53924ec25a150a |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:55 p.m.