Triple

T30980917
Position Surface form Disambiguated ID Type / Status
Subject Tiburon as a railroad terminus E789369 entity
Predicate instanceOf P0 FINISHED
Object railroad terminus C10600 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railroad terminus
Context triple: [Tiburon as a railroad terminus, instanceOf, railroad terminus]
  • A. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • B. terminal railroad
    A terminal railroad is a short-line or switching railroad that operates within a limited area, typically serving as an interchange point between major railroads and local industries, handling the transfer, classification, and delivery of freight cars.
  • C. narrow-gauge railway terminus
    A narrow-gauge railway terminus is the end station or final stopping point on a railway line that uses tracks of narrower width than the standard gauge, where trains begin or conclude their journeys and related operations are managed.
  • D. terminal station chosen
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • E. railroad depot
    A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c4831c8190be53924ec25a150a completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:55 p.m.