Triple

T30970816
Position Surface form Disambiguated ID Type / Status
Subject Karimganj Municipal Board E789091 entity
Predicate responsibleFor P636 FINISHED
Object Regulation of building construction within its limits LITERAL FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Regulation of building construction within its limits | Statement: [Karimganj Municipal Board, responsibleFor, Regulation of building construction within its limits]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f69388a3e881908ef75d9c3e677b48 completed May 3, 2026, 12:15 a.m.
Created at: April 29, 2026, 8:54 p.m.