Triple

T30968885
Position Surface form Disambiguated ID Type / Status
Subject Radio Block Centre E789035 entity
Predicate instanceOf P0 FINISHED
Object railway signalling subsystem C3559 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway signalling subsystem
Context triple: [Radio Block Centre, instanceOf, railway signalling subsystem]
  • A. railway signaling system chosen
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • C. railway classification system
    A railway classification system is a structured framework used to categorize railways, trains, or rail services based on characteristics such as function, capacity, speed, infrastructure, or ownership.
  • D. train control system
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • E. railway location coding system
    A railway location coding system is a standardized scheme for assigning unique codes to specific points, facilities, and segments along a rail network to support identification, operations, and data management.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.