Triple

T30968857
Position Surface form Disambiguated ID Type / Status
Subject Euroloop E789034 entity
Predicate instanceOf P0 FINISHED
Object ETCS subsystem C3558 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ETCS subsystem
Context triple: [Euroloop, instanceOf, ETCS subsystem]
  • A. train control system chosen
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • B. third rail electrification system
    A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
  • C. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • D. InterCityExpress variant
    An InterCityExpress variant is a specific model or configuration of high-speed ICE train designed for particular routes, capacities, or service requirements within an intercity rail network.
  • E. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.