Triple
T30968856
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Euroloop |
E789034
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trackside transmission system |
C30219
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trackside transmission system Context triple: [Euroloop, instanceOf, trackside transmission system]
-
A.
train control system
A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
-
B.
transmission system footprint
The transmission system footprint is the geographic and physical extent of all transmission infrastructure and associated rights-of-way required to deliver electricity across a power grid.
-
C.
third rail electrification system
A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
-
D.
railway communication system
chosen
A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
-
E.
drivetrain technology
Drivetrain technology encompasses the systems and components that transmit power from a vehicle’s engine or motor to its wheels, optimizing efficiency, performance, and control.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c3a6b48190951add9b7b7f0271 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:54 p.m.