Triple

T30967398
Position Surface form Disambiguated ID Type / Status
Subject Morgan Offshore Wind Project E788995 entity
Predicate instanceOf P0 FINISHED
Object planned energy project C53115 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned energy project
Context triple: [Morgan Offshore Wind Project, instanceOf, planned energy project]
  • A. renewable energy technology project chosen
    A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
  • B. planned hydroelectric power station
    A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
  • C. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. cross-border energy infrastructure project
    A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
  • E. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.