Triple

T30967353
Position Surface form Disambiguated ID Type / Status
Subject North Rhyl Offshore Wind Farm (planned) E788994 entity
Predicate instanceOf P0 FINISHED
Object offshore wind farm project C7975 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: offshore wind farm project
Context triple: [North Rhyl Offshore Wind Farm (planned), instanceOf, offshore wind farm project]
  • A. offshore wind licensing round
    An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
  • B. wind power facility chosen
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • C. offshore oil and gas development project
    An offshore oil and gas development project is a large-scale, capital-intensive initiative that plans, designs, constructs, and operates facilities at sea to extract, process, and transport hydrocarbons from subsea reservoirs to market.
  • D. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • E. wind power industry
    The wind power industry encompasses the development, manufacturing, installation, operation, and maintenance of wind energy technologies and infrastructure to generate electricity from wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c3a6b48190951add9b7b7f0271 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.