Triple

T30955928
Position Surface form Disambiguated ID Type / Status
Subject 上海商城 E788675 entity
Predicate instanceOf P0 FINISHED
Object 写字楼建筑 C20053 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 写字楼建筑
Context triple: [上海商城, instanceOf, 写字楼建筑]
  • A. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • B. commercial high-rise chosen
    A commercial high-rise is a tall, multi-story building primarily designed and constructed to house businesses, offices, and other commercial activities within an urban environment.
  • C. commercial building projects
    Commercial building projects are organized efforts to plan, design, finance, construct, and deliver structures intended primarily for business, retail, office, or other non-residential commercial uses.
  • D. high‑rise building
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • E. Meta office building
    A Meta office building is a modern, technology-driven corporate facility designed to support Meta employees with collaborative workspaces, advanced digital infrastructure, and amenities that reflect the company’s culture and operational needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c28c1881908c33b45d689f1724 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.