Triple

T30955926
Position Surface form Disambiguated ID Type / Status
Subject 上海商城 E788675 entity
Predicate instanceOf P0 FINISHED
Object 商业综合体 C57270 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 商业综合体
Context triple: [上海商城, instanceOf, 商业综合体]
  • A. commercial and residential complex
    A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
  • B. commercial park
    A commercial park is a planned area of land developed with multiple business facilities—such as offices, retail spaces, and light industrial units—designed to support commercial activities within a cohesive, often landscaped environment.
  • C. commercial high-rise
    A commercial high-rise is a tall, multi-story building primarily designed and constructed to house businesses, offices, and other commercial activities within an urban environment.
  • D. mixed-use skyscraper complex
    A mixed-use skyscraper complex is a vertically integrated high-rise development that combines residential, commercial, office, and often recreational or civic functions within a unified architectural and infrastructural framework.
  • E. commercial building projects
    Commercial building projects are organized efforts to plan, design, finance, construct, and deliver structures intended primarily for business, retail, office, or other non-residential commercial uses.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c28c1881908c33b45d689f1724 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:54 p.m.