Triple

T30953225
Position Surface form Disambiguated ID Type / Status
Subject Eurobalise E788602 entity
Predicate instanceOf P0 FINISHED
Object railway signalling equipment C3574 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway signalling equipment
Context triple: [Eurobalise, instanceOf, railway signalling equipment]
  • A. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. railway communication system
    A railway communication system is an integrated network of technologies and protocols that enable real-time exchange of information between trains, trackside equipment, and control centers to ensure safe, efficient, and coordinated railway operations.
  • C. railway infrastructure element chosen
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • D. railway works section
    A railway works section is a defined segment of railway infrastructure and track, managed as a unit for construction, maintenance, and operational oversight.
  • E. railway terminology
    Railway terminology is the specialized vocabulary used to describe the infrastructure, operations, equipment, and procedures associated with rail transport systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c28c1881908c33b45d689f1724 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:53 p.m.