Triple

T30953131
Position Surface form Disambiguated ID Type / Status
Subject Technical Specifications for Interoperability E788600 entity
Predicate instanceOf P0 FINISHED
Object railway interoperability specification C17465 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway interoperability specification
Context triple: [Technical Specifications for Interoperability, instanceOf, railway interoperability specification]
  • A. standardized rail interface
    A standardized rail interface is a uniform physical and electrical connection system that allows different rail vehicles, components, or infrastructure elements to interoperate safely and efficiently across multiple networks or manufacturers.
  • B. railway technical standard chosen
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • C. railway locomotive standardization scheme
    A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. joint railway
    A joint railway is a rail line or network that is owned, operated, or managed collaboratively by two or more railway companies or authorities, sharing infrastructure, services, and responsibilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c28c1881908c33b45d689f1724 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:53 p.m.