Triple

T30949533
Position Surface form Disambiguated ID Type / Status
Subject Fujifilm X-S20 E788495 entity
Predicate continuousShootingMechanicalShutter P170045 FINISHED
Object up to 8 fps LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: up to 8 fps | Statement: [Fujifilm X-S20, continuousShootingMechanicalShutter, up to 8 fps]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: continuousShootingMechanicalShutter
Context triple: [Fujifilm X-S20, continuousShootingMechanicalShutter, up to 8 fps]
  • A. maxContinuousShooting chosen
    Indicates the maximum number of photos a camera can continuously capture in rapid succession before it must pause or slow down.
  • B. flashSyncSpeedMechanical
    Indicates the maximum shutter speed at which a mechanical shutter can synchronize properly with a flash.
  • C. hasElectronicShutter
    Indicates that an entity is equipped with or supports an electronic shutter mechanism for capturing images without a mechanical shutter.
  • D. hasShutterSpeedDial
    Indicates that an object possesses a dedicated control or mechanism for adjusting shutter speed.
  • E. shutterSpeed
    Indicates the exposure time setting of a camera, defining how long the shutter remains open during an image capture.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c180f88190ad177372ee02b7e2 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69fb563aec448190875410fb1a3ed624 completed May 6, 2026, 2:54 p.m.
PD Predicate disambiguation batch_69fb35b9ede881908aaae93a215525df completed May 6, 2026, 12:36 p.m.
Created at: April 29, 2026, 8:53 p.m.