Triple
T30940735
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North and Mid Wales Trunk Road Agent |
E788252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport infrastructure management agency |
C6404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport infrastructure management agency Context triple: [North and Mid Wales Trunk Road Agent, instanceOf, transport infrastructure management agency]
-
A.
transport infrastructure operator
chosen
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
B.
public transportation agency
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
C.
railway infrastructure manager
A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
-
D.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
E.
congestion management agency
A congestion management agency is an organization responsible for planning, coordinating, and implementing strategies to reduce traffic congestion and improve transportation system efficiency within a specific region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224c180f88190ad177372ee02b7e2 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:53 p.m.