Triple

T30933047
Position Surface form Disambiguated ID Type / Status
Subject World's Best Boss mug E788045 entity
Predicate propStatus P149065 FINISHED
Object recognizable TV prop LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: recognizable TV prop | Statement: [World's Best Boss mug, propStatus, recognizable TV prop]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: propStatus
Context triple: [World's Best Boss mug, propStatus, recognizable TV prop]
  • A. propState chosen
    Indicates that an entity possesses, is in, or exhibits a particular state or condition.
  • B. propertyStatus
    Indicates the current condition, state, or classification assigned to a property within a given context (e.g., availability, legal standing, or operational state).
  • C. status
    Indicates the current condition, state, or standing of an entity within a given context.
  • D. proposerState
    Indicates the current status or condition of a proposer within a proposal or decision-making process.
  • E. actStatus
    Indicates the current state or condition of an action or event, such as whether it is planned, ongoing, completed, or cancelled.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224c0b7fc819090cb89df60d23653 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f692e1aef48190b8ac1b2027013d94 completed May 3, 2026, 12:12 a.m.
PD Predicate disambiguation batch_69f68b7ec098819080480998038de940 completed May 2, 2026, 11:40 p.m.
Created at: April 29, 2026, 8:52 p.m.