Triple

T30915291
Position Surface form Disambiguated ID Type / Status
Subject Clark Civil Aviation Complex E787561 entity
Predicate instanceOf P0 FINISHED
Object aviation complex C36245 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aviation complex
Context triple: [Clark Civil Aviation Complex, instanceOf, aviation complex]
  • A. aviation infrastructure network
    An aviation infrastructure network is an interconnected system of airports, airways, navigation aids, communication systems, and support facilities that collectively enable the safe, efficient movement of aircraft and passengers.
  • B. aircraft factory
    An aircraft factory is an industrial facility where aircraft and their components are designed, manufactured, assembled, and tested before delivery to customers.
  • C. aviation infrastructure organization chosen
    An aviation infrastructure organization is an entity responsible for planning, developing, operating, and maintaining the physical and technological systems that support air transportation, such as airports, air traffic control, and related facilities.
  • D. aviation attraction
    An aviation attraction is a location, exhibit, or experience designed to engage visitors with aircraft, flight history, and aeronautical technology through displays, demonstrations, or interactive activities.
  • E. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224be300c8190a6513ce1ee0a7026 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:51 p.m.