Triple

T3088563
Position Surface form Disambiguated ID Type / Status
Subject Muppet*Vision 3D E64431 entity
Predicate preShow P20431 FINISHED
Object Muppet laboratory and backstage antics LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Muppet laboratory and backstage antics | Statement: [Muppet*Vision 3D, preShow, Muppet laboratory and backstage antics]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: preShow
Context triple: [Muppet*Vision 3D, preShow, Muppet laboratory and backstage antics]
  • A. preludeTo chosen
    Indicates that one event, action, or state occurs earlier and serves as an introduction or lead-in to another.
  • B. preparesFor
    Indicates that one entity is used, designed, or undertaken in order to get another entity ready for a future event, state, or activity.
  • C. presentedFor
    Indicates that one entity was formally offered, submitted, or shown to another entity for consideration, review, or action.
  • D. precondition
    Indicates that one event, state, or condition must be true or occur before another event, state, or condition can validly or successfully take place.
  • E. preStateFunction
    Indicates that a function or system is in a specific state or configuration before a particular action, event, or transition occurs.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857c97d88190b26f9b1c90839c77 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ada20b99a4819090c3d3e08ed556ad completed March 8, 2026, 4:21 p.m.
PD Predicate disambiguation batch_69ad9ded78f881908be6fc0fb7c35764 completed March 8, 2026, 4:03 p.m.
Created at: March 8, 2026, 3:03 p.m.