Triple
T30861341
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 高松シンボルタワー |
E786068
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 高層複合ビル |
C36407
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 高層複合ビル Context triple: [高松シンボルタワー, instanceOf, 高層複合ビル]
-
A.
官公庁複合ビル
官公庁複合ビルは、複数の官公庁や公共機関が入居し、行政サービスを一体的かつ効率的に提供するための多機能な高層建築物である。
-
B.
Mori Building
Mori Building is a conceptual class representing a large-scale urban development entity that plans, constructs, owns, and manages high-rise buildings and mixed-use complexes within metropolitan environments.
-
C.
high‑rise building
chosen
A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
-
D.
supertall building
A supertall building is an exceptionally high skyscraper, typically exceeding 300 meters (984 feet) in height, designed to accommodate mixed uses such as offices, residences, and public spaces within a highly vertical structure.
-
E.
mixed-use skyscraper complex
A mixed-use skyscraper complex is a vertically integrated high-rise development that combines residential, commercial, office, and often recreational or civic functions within a unified architectural and infrastructural framework.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b91c14819084e764832fe67a57 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:47 p.m.