Triple
T30854874
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Suez Canal terminals |
E785892
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | port infrastructure complex |
C53972
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: port infrastructure complex Context triple: [Suez Canal terminals, instanceOf, port infrastructure complex]
-
A.
port facility complex
chosen
A port facility complex is an integrated area of land and water with infrastructure, equipment, and services designed to support the berthing, loading, unloading, storage, and transfer of cargo and passengers between sea and land transport modes.
-
B.
bridge–tunnel complex
A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
-
C.
maritime cargo terminal
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
-
D.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
E.
commercial and transportation complex
A commercial and transportation complex is a multifunctional facility that integrates retail, business services, and transit infrastructure to support shopping, commerce, and the movement of people and goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b91c14819084e764832fe67a57 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:46 p.m.