Triple

T30852227
Position Surface form Disambiguated ID Type / Status
Subject DuPage Airport Authority E785813 entity
Predicate instanceOf P0 FINISHED
Object public airport authority C1049 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: public airport authority
Context triple: [DuPage Airport Authority, instanceOf, public airport authority]
  • A. airport authority chosen
    An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
  • B. public airport
    A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
  • C. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • D. aviation authority
    An aviation authority is a governmental or regulatory body responsible for overseeing civil aviation safety, security, standards, and compliance within a specific jurisdiction.
  • E. city airport
    A city airport is a transportation hub located within or near an urban area that facilitates the arrival, departure, and transfer of passengers and cargo via commercial and private aircraft.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b91c14819084e764832fe67a57 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:46 p.m.