Triple

T3084242
Position Surface form Disambiguated ID Type / Status
Subject The Marvelous Mrs. Maisel E64330 entity
Predicate seriesEndYear P214 FINISHED
Object 2023 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2023 | Statement: [The Marvelous Mrs. Maisel, seriesEndYear, 2023]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: seriesEndYear
Context triple: [The Marvelous Mrs. Maisel, seriesEndYear, 2023]
  • A. serializationEndYear
    Indicates the year in which the serialization or serialized publication of an entity concluded.
  • B. endYear chosen
    Indicates the year in which an event, state, or relationship comes to an end.
  • C. spinOffSeriesEndYear
    Indicates the year in which a spin-off series concluded or ended its run.
  • D. qualificationEndYear
    Indicates the calendar year in which a qualification, certification, or course of study was completed or ended.
  • E. finalReleaseYear
    Indicates the calendar year in which something (such as a product, work, or version) is officially released for the last time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad857bb4c88190a4cf27893fcabed8 completed March 8, 2026, 2:19 p.m.
NER Named-entity recognition batch_69ada1e98a1c8190b1dd4a0a47f7d6c6 completed March 8, 2026, 4:20 p.m.
PD Predicate disambiguation batch_69ad9debb6308190be28378ae1fc98af completed March 8, 2026, 4:03 p.m.
Created at: March 8, 2026, 3:03 p.m.