Triple
T30834749
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Transformation of Tour Bois-le-Prêtre, Paris |
E785329
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | social housing renovation |
C41059
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: social housing renovation Context triple: [Transformation of Tour Bois-le-Prêtre, Paris, instanceOf, social housing renovation]
-
A.
housing reform movement
The housing reform movement is a social and political effort aimed at improving living conditions, affordability, and access to safe, adequate housing through changes in laws, policies, and urban planning practices.
-
B.
social housing model
A social housing model is a framework for providing affordable, secure, and socially inclusive housing, typically supported or regulated by public or non-profit entities to meet the needs of low- and moderate-income households.
-
C.
social housing ensemble
A social housing ensemble is a cohesive group of residential buildings and shared spaces designed to provide affordable, community-oriented living for diverse populations within an integrated urban or suburban setting.
-
D.
affordable housing project
chosen
An affordable housing project is a planned development that provides safe, decent, and financially accessible homes to low- and moderate-income individuals or families, often supported by public subsidies or incentives.
-
E.
housing ministry
The housing ministry is a government department responsible for planning, regulating, and implementing policies and programs related to housing development, affordability, and urban living conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b73d8c81908129383bfb397c87 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:45 p.m.