Triple
T30828083
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nag River Rejuvenation Project |
E785131
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pollution abatement project |
C2060
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pollution abatement project Context triple: [Nag River Rejuvenation Project, instanceOf, pollution abatement project]
-
A.
water pollution control program
A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
-
B.
environmental cleanup fund
An environmental cleanup fund is a dedicated pool of financial resources established to pay for the assessment, remediation, and long-term management of contaminated sites and environmental damage.
-
C.
urban environmental project
An urban environmental project is an organized initiative aimed at improving the ecological health, sustainability, and livability of city spaces through interventions such as green infrastructure, pollution reduction, and community engagement.
-
D.
reclamation project
A reclamation project is an organized effort to restore, rehabilitate, or repurpose disturbed or degraded land, water, or resources for productive or environmentally sustainable use.
-
E.
environmental programme
chosen
An environmental programme is an organized set of coordinated activities, policies, and initiatives designed to protect, manage, or improve the natural environment and promote sustainable practices.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b6642481909e8d701de2cd1a53 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:44 p.m.