Triple

T30815380
Position Surface form Disambiguated ID Type / Status
Subject Roman circus of Mérida E784760 entity
Predicate instanceOf P0 FINISHED
Object Roman circus C22276 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Roman circus
Context triple: [Roman circus of Mérida, instanceOf, Roman circus]
  • A. chariot-racing stadium
    A chariot-racing stadium is a large, elongated arena designed with a central track, turning posts, and tiered seating to host and view competitive chariot races.
  • B. ancient hippodrome chosen
    An ancient hippodrome is a large, elongated open-air stadium used primarily in Greek and Roman times for horse and chariot racing, public games, and ceremonial events.
  • C. Roman musical gathering
    A Roman musical gathering is a social event in ancient Rome where participants assemble in a domestic or public setting to enjoy live performances of vocal and instrumental music, often accompanied by poetry, dining, and conversation.
  • D. Roman theatre
    A Roman theatre is a large, semi-circular open-air structure designed for public performances, featuring tiered seating, an orchestra, and an elaborately decorated stage building.
  • E. Greco-Roman theatre
    A Greco-Roman theatre is a large, open-air performance structure combining Greek semicircular seating and Roman architectural innovations, used for dramatic, musical, and public spectacles in antiquity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b4eda48190bd212ce4f3901e56 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:43 p.m.