Triple
T30786005
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | さいたま新都心合同庁舎第1号館 |
E783956
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 官公庁複合ビル |
C57221
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 官公庁複合ビル Context triple: [さいたま新都心合同庁舎第1号館, instanceOf, 官公庁複合ビル]
-
A.
Mori Building
Mori Building is a conceptual class representing a large-scale urban development entity that plans, constructs, owns, and manages high-rise buildings and mixed-use complexes within metropolitan environments.
-
B.
미완공 건물
미완공 건물은 설계와 골조 등 일부 공사가 진행되었으나 사용 가능 단계까지 모든 건축 공정이 완료되지 않은 상태의 건축물을 의미한다.
-
C.
civic tower
A civic tower is a prominent public structure, often part of a town hall or central square, that symbolizes municipal authority and community identity while housing functions such as clocks, bells, or observation platforms.
-
D.
Shenzhen Metro station
A Shenzhen Metro station is a designated public transit facility within the Shenzhen Metro system where trains stop to allow passengers to board, alight, and transfer between lines.
-
E.
Yoshimoto Kogyo facility
A Yoshimoto Kogyo facility is a venue or complex owned or operated by the Japanese entertainment company Yoshimoto Kogyo, used for producing, rehearsing, and hosting performances, events, and related entertainment activities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b213c8819083886073f90b647e |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:41 p.m.