Triple
T30785810
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 広島市現代美術館 |
E783951
|
entity |
| Predicate | 開館年 |
P84798
|
FINISHED |
| Object | 1989年 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1989年 | Statement: [広島市現代美術館, 開館年, 1989年]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: 開館年 Context triple: [広島市現代美術館, 開館年, 1989年]
-
A.
officialOpeningYear
Indicates the calendar year in which something was formally opened or inaugurated for official use.
-
B.
yearOpenedToPublic
chosen
Indicates the calendar year in which something (such as a place, facility, or service) was first made accessible to the general public.
-
C.
reopeningYearAsMuseum
Indicates the year in which a place or building was reopened specifically to function as a museum.
-
D.
structureOpeningYear
Indicates the calendar year in which a structure was first opened for use or public access.
-
E.
originalPlannedOpeningYear
Indicates the year that was initially scheduled or intended for something to open, before any delays or changes.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224b213c8819083886073f90b647e |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69f68fe8168c8190b083be0e33988b9c |
completed | May 2, 2026, 11:59 p.m. |
| PD | Predicate disambiguation | batch_69f686140aa08190a35f62572b2db9b6 |
completed | May 2, 2026, 11:17 p.m. |
Created at: April 29, 2026, 8:41 p.m.