Triple

T30785760
Position Surface form Disambiguated ID Type / Status
Subject 中銀カプセルタワービル E783950 entity
Predicate 竣工日 P1511 FINISHED
Object 1972年4月 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1972年4月 | Statement: [中銀カプセルタワービル, 竣工日, 1972年4月]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: 竣工日
Context triple: [中銀カプセルタワービル, 竣工日, 1972年4月]
  • A. assemblyCompletionDate
    Indicates the date on which the assembly process for an item or structure is finished.
  • B. substantialCompletionDate
    Indicates the date on which a project, work, or obligation is considered substantially complete, meaning the main required work has been finished to the point it can be used for its intended purpose.
  • C. dateFinalized
    Indicates that a specific date has been set as the official or final completion/confirmation time for an associated event, decision, or record.
  • D. laterDamCompletionDate
    Indicates that one dam’s completion date occurs chronologically after another dam’s completion date.
  • E. constructionCompleted chosen
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b213c8819083886073f90b647e completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f68fe8168c8190b083be0e33988b9c completed May 2, 2026, 11:59 p.m.
PD Predicate disambiguation batch_69f686140aa08190a35f62572b2db9b6 completed May 2, 2026, 11:17 p.m.
Created at: April 29, 2026, 8:41 p.m.