Triple

T30785748
Position Surface form Disambiguated ID Type / Status
Subject 中銀カプセルタワービル E783950 entity
Predicate instanceOf P0 FINISHED
Object オフィスビル C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: オフィスビル
Context triple: [中銀カプセルタワービル, instanceOf, オフィスビル]
  • A. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • B. Meta office building
    A Meta office building is a modern, technology-driven corporate facility designed to support Meta employees with collaborative workspaces, advanced digital infrastructure, and amenities that reflect the company’s culture and operational needs.
  • C. Mori Building
    Mori Building is a conceptual class representing a large-scale urban development entity that plans, constructs, owns, and manages high-rise buildings and mixed-use complexes within metropolitan environments.
  • D. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. high‑rise building
    A high-rise building is a tall, multi-story structure designed to accommodate residential, commercial, or mixed-use functions, typically requiring vertical transportation systems such as elevators.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b213c8819083886073f90b647e completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:41 p.m.