Triple
T3074427
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The New Course |
E64102
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | political work |
C12227
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: political work Context triple: [The New Course, instanceOf, political work]
-
A.
political writing
Political writing is a form of communication that analyzes, critiques, or advocates positions on public policies, governance, and power structures to inform or persuade audiences.
-
B.
political directorate
A political directorate is a governing body or leadership group within a state or organization that collectively directs political strategy, policy, and decision-making.
-
C.
political fiction
Political fiction is a literary genre that uses imagined narratives to explore, critique, or illuminate political systems, ideologies, power structures, and their impact on individuals and societies.
-
D.
political movement
A political movement is a collective effort by a group of people, often organized around shared ideas or grievances, seeking to influence or change government policies, social structures, or political power.
-
E.
political speech
A political speech is a formal oral presentation delivered by a public figure or candidate to persuade, inform, or mobilize an audience about political ideas, policies, or actions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad857a8aec8190bfdfd9c14554ac5a |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:02 p.m.