Triple

T30727683
Position Surface form Disambiguated ID Type / Status
Subject Orpington bus garage E782325 entity
Predicate instanceOf P0 FINISHED
Object bus garage C19540 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus garage
Context triple: [Orpington bus garage, instanceOf, bus garage]
  • A. parking garage
    A parking garage is a multi-level or enclosed structure designed to provide organized, secure, and efficient parking spaces for vehicles.
  • B. parking facility chosen
    A parking facility is a designated area or structure that provides organized spaces for vehicles to be temporarily stored.
  • C. streetcar storage facility
    A streetcar storage facility is a specialized depot where streetcars are parked, maintained, and serviced when not in operation on transit routes.
  • D. private automotive facility
    A private automotive facility is a secure, non-public site equipped for storing, maintaining, testing, or customizing vehicles, typically owned or controlled by an individual, organization, or manufacturer.
  • E. streetcar facility
    A streetcar facility is a dedicated site that supports the operation, storage, maintenance, and dispatching of streetcars within a transit system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224ad9f9c81908e02a79ae0001137 completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:37 p.m.