Triple

T30724532
Position Surface form Disambiguated ID Type / Status
Subject Keretapi Tanah Melayu West Coast Line E782241 entity
Predicate nonElectrifiedSections P21804 FINISHED
Object Gemas–Johor Bahru corridor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gemas–Johor Bahru corridor | Statement: [Keretapi Tanah Melayu West Coast Line, nonElectrifiedSections, Gemas–Johor Bahru corridor]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nonElectrifiedSections
Context triple: [Keretapi Tanah Melayu West Coast Line, nonElectrifiedSections, Gemas–Johor Bahru corridor]
  • A. nonElectrifiedSection chosen
    Indicates that a segment of a transportation or track network lacks electrical infrastructure for powered operation.
  • B. isElectrifiedSectionOf
    Indicates that one section or segment is a part of a larger entity and has been equipped with electrical power or electrification.
  • C. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • D. numberOfElectrifiedLines
    Indicates the quantity of railway or transit lines within a system or network that are equipped with electrical power infrastructure for operation.
  • E. isElectricRailway
    Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224ad9f9c81908e02a79ae0001137 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f68c5bab9c8190b1f0518559c5259f completed May 2, 2026, 11:44 p.m.
PD Predicate disambiguation batch_69f6861170d08190bb98be609d436f84 completed May 2, 2026, 11:17 p.m.
Created at: April 29, 2026, 8:36 p.m.