Triple

T30719207
Position Surface form Disambiguated ID Type / Status
Subject WWE Backlash 2023 E782105 entity
Predicate instanceOf P0 FINISHED
Object WWE premium live event C57191 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: WWE premium live event
Context triple: [WWE Backlash 2023, instanceOf, WWE premium live event]
  • A. WWE Network event
    A WWE Network event is a live or pre-recorded professional wrestling show or special produced by WWE and distributed exclusively through its WWE Network streaming service.
  • B. WWE event match
    A WWE event match is a scripted professional wrestling contest held as part of a World Wrestling Entertainment show, featuring predetermined outcomes, story-driven rivalries, and in-ring athletic performance.
  • C. Wrestle Kingdom event
    A Wrestle Kingdom event is New Japan Pro-Wrestling’s annual flagship professional wrestling supercard, typically held each January at the Tokyo Dome and featuring marquee matches, title bouts, and international talent.
  • D. WrestleMania
    WrestleMania is an annual flagship professional wrestling event produced by WWE, featuring high-profile matches, celebrity appearances, and major storyline culminations on a global stage.
  • E. World Championship Wrestling show
    A World Championship Wrestling show is a televised or live event produced by the WCW promotion featuring professional wrestling matches, storylines, and entertainment segments for audiences.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224acd24481908ed5f96f0d69b5dd completed April 29, 2026, 3:33 p.m.
Created at: April 29, 2026, 8:36 p.m.