Triple
T30713320
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SNCF Est region |
E781952
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | SNCF regional directorate |
C54377
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: SNCF regional directorate Context triple: [SNCF Est region, instanceOf, SNCF regional directorate]
-
A.
SNCF operating region
chosen
An SNCF operating region is a geographically defined area within the French national railway network where SNCF manages and coordinates train operations, infrastructure, and services.
-
B.
TGV Réseau
TGV Réseau is a class of high-speed electric multiple unit trains operated by SNCF in France, designed for long-distance services on the French high-speed rail network.
-
C.
Transilien station
A Transilien station is a railway facility in the Île-de-France region that serves suburban and regional commuter trains operated under the Transilien network, providing passenger access, ticketing, and related services.
-
D.
TER Normandie station
A TER Normandie station is a regional railway stop in the Normandy region of France that serves as a boarding, alighting, and transfer point for passengers using the TER Normandie train network.
-
E.
Clermont-Ferrand tramway station
A Clermont-Ferrand tramway station is a public transport facility in Clermont-Ferrand, France, where passengers board and alight from the city’s tram services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224acd24481908ed5f96f0d69b5dd |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:35 p.m.