Triple
T30709194
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kurhaus |
E781843
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | building type |
C21956
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: building type Context triple: [Kurhaus, instanceOf, building type]
-
A.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
residential building type
A residential building type is a category of structures designed primarily for people to live in, characterized by specific forms, layouts, and occupancy patterns such as single-family homes, apartments, or townhouses.
-
C.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
-
D.
public building category
A public building category classifies structures primarily intended for community use and access, such as government offices, libraries, schools, and cultural facilities.
-
E.
architectural structure type
chosen
An architectural structure type is a conceptual category that defines buildings or constructions based on their form, function, and structural characteristics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224abfcf081909492e64d3cc35262 |
completed | April 29, 2026, 3:33 p.m. |
Created at: April 29, 2026, 8:35 p.m.