Triple
T30691570
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Александр Николаевич Бенуа |
E781340
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | сценограф |
C25190
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: сценограф Context triple: [Александр Николаевич Бенуа, instanceOf, сценограф]
-
A.
scenic designer
chosen
A scenic designer is a creative professional who conceptualizes and creates the visual environment for stage, film, or television productions, including sets, props, and spatial aesthetics to support the story and director’s vision.
-
B.
production designer
A production designer is the creative professional responsible for the overall visual concept of a film, television show, or theater production, overseeing sets, locations, props, and often collaborating closely with directors and cinematographers to establish the project’s look and feel.
-
C.
projection designer
A projection designer is a creative professional who conceptualizes, designs, and programs projected visual content to enhance live performances, events, or environments.
-
D.
costume designer
A costume designer is a creative professional who conceptualizes, designs, and oversees the creation of clothing and accessories that define characters’ appearance in film, theater, television, or other performances.
-
E.
prop designer
A prop designer is a creative professional who conceptualizes, designs, and oversees the creation of physical objects used in film, theater, television, and other productions to support storytelling and enhance visual authenticity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224ab24e08190991d6edb6df58e8b |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:33 p.m.