Triple

T3067624
Position Surface form Disambiguated ID Type / Status
Subject Seven Sacred Pools E62143 entity
Predicate instanceOf P0 FINISHED
Object waterfall series C10124 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: waterfall series
Context triple: [Seven Sacred Pools, instanceOf, waterfall series]
  • A. waterfall system
    A waterfall system is a linear, sequential project management or development approach in which progress flows through distinct, non-overlapping phases from requirements to deployment with minimal iteration.
  • B. waterfall section
    A waterfall section is a vertical or longitudinal drawing that illustrates a sequence of stepped or cascading level changes, often used to show how spaces, terrains, or elements transition in height over a distance.
  • C. waterfall area
    A waterfall area is a natural or landscaped region surrounding a waterfall, including the cascade itself, its plunge pool, and adjacent terrain where water flow, mist, and erosion shape the local environment and visitor experience.
  • D. tiered waterfall chosen
    A tiered waterfall is a cascading water feature where water descends over multiple distinct vertical drops or steps, creating a series of successive falls.
  • E. watershed
    A watershed is a land area that channels rainfall and snowmelt into streams and rivers, ultimately draining into a common outlet such as a larger river, lake, or ocean.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85793e5c8190a358049bc4a98d8c completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.