Triple

T30676100
Position Surface form Disambiguated ID Type / Status
Subject California renewable portfolio standard E780912 entity
Predicate instanceOf P0 FINISHED
Object renewable portfolio standard C57352 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: renewable portfolio standard
Context triple: [California renewable portfolio standard, instanceOf, renewable portfolio standard]
  • A. renewable energy project portfolio
    A renewable energy project portfolio is a strategically managed collection of diverse clean energy initiatives (such as solar, wind, hydro, and storage projects) designed to achieve specific financial, environmental, and risk-management objectives.
  • B. renewable energy power station
    A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
  • C. integrated resource plan
    An integrated resource plan is a long-term strategy that evaluates and selects a mix of energy supply- and demand-side resources to reliably and cost-effectively meet projected future energy needs while considering environmental, regulatory, and stakeholder objectives.
  • D. renewable energy technology project
    A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
  • E. electricity reliability regulator
    An electricity reliability regulator is an authority responsible for setting, monitoring, and enforcing standards to ensure the continuous, safe, and dependable operation of the electric power system.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a7fc208190a07d6d3879b31640 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:32 p.m.