Triple
T30663732
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Valravn |
E780601
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Dive Coaster |
C4764
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Dive Coaster Context triple: [Valravn, instanceOf, Dive Coaster]
-
A.
Wing Coaster
A Wing Coaster is a type of roller coaster where riders are seated on either side of the track with nothing above or below them, creating a free-floating, wing-like flight experience.
-
B.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
C.
roller coaster
chosen
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
D.
launched roller coaster
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
E.
shoot-the-chute ride
A shoot-the-chute ride is an amusement attraction where a flat-bottomed boat ascends a lift and then plunges down a steep flume into a splash pool, creating a dramatic water spray for riders and spectators.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a6d10481909290be1a00fc83b3 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:31 p.m.