Triple

T30651607
Position Surface form Disambiguated ID Type / Status
Subject The Courtroom E780273 entity
Predicate instanceOf P0 FINISHED
Object verbatim theatre work C3721 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: verbatim theatre work
Context triple: [The Courtroom, instanceOf, verbatim theatre work]
  • A. epic theatre work
    An epic theatre work is a dramatic piece designed to provoke critical reflection and social awareness in the audience through techniques that disrupt emotional immersion, such as narration, direct address, and visible theatrical devices.
  • B. dramatic works
    Dramatic works are literary or artistic compositions intended for performance, typically involving scripted dialogue and staged action to depict conflicts, emotions, and relationships before an audience.
  • C. stage play chosen
    A stage play is a scripted dramatic performance presented live by actors on a theater stage before an audience.
  • D. theater workshop
    A theater workshop is a structured, collaborative learning environment where participants explore and develop performance skills through exercises, improvisations, and guided practice.
  • E. stage interpretation of a literary work
    A stage interpretation of a literary work is a live theatrical adaptation that transforms the text’s narrative, characters, and themes into performance through acting, staging, and design choices.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a5d2b481908a6853cd0138e2d7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:30 p.m.