Triple

T30645817
Position Surface form Disambiguated ID Type / Status
Subject New Routemaster E780114 entity
Predicate instanceOf P0 FINISHED
Object hybrid bus C57326 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hybrid bus
Context triple: [New Routemaster, instanceOf, hybrid bus]
  • A. plug-in hybrid electric vehicle
    A plug-in hybrid electric vehicle is a car that combines an internal combustion engine with an electric motor and a rechargeable battery that can be charged from an external power source, allowing it to drive on electric power alone for limited distances before switching to hybrid operation.
  • B. diesel-powered highway bus
    A diesel-powered highway bus is a large, long-distance passenger vehicle designed for high-speed road travel, propelled by a diesel engine for efficient, sustained operation over extended routes.
  • C. battery-hybrid ferry
    A battery-hybrid ferry is a passenger or vehicle-carrying vessel that combines battery-electric propulsion with conventional engines to reduce fuel consumption and emissions while maintaining operational flexibility.
  • D. hybrid powertrain technology
    Hybrid powertrain technology integrates an internal combustion engine with one or more electric motors and a battery system to optimize fuel efficiency, reduce emissions, and enhance vehicle performance through intelligent power management.
  • E. double-decker bus
    A double-decker bus is a large passenger vehicle with two levels of seating designed to carry many people efficiently, often used in urban public transport and sightseeing.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a5d2b481908a6853cd0138e2d7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:29 p.m.