Triple

T30645722
Position Surface form Disambiguated ID Type / Status
Subject Rolling Bridge, Paddington Basin, London E780112 entity
Predicate instanceOf P0 FINISHED
Object kinetic bridge C4026 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: kinetic bridge
Context triple: [Rolling Bridge, Paddington Basin, London, instanceOf, kinetic bridge]
  • A. movable bridge chosen
    A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
  • B. tensegrity bridge
    A tensegrity bridge is a lightweight, stable structure that uses a network of isolated compression elements (like struts) suspended within a continuous system of tension elements (like cables) to span a distance efficiently.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • E. multipurpose bridge
    A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a5d2b481908a6853cd0138e2d7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:29 p.m.