Triple
T30645722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rolling Bridge, Paddington Basin, London |
E780112
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | kinetic bridge |
C4026
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: kinetic bridge Context triple: [Rolling Bridge, Paddington Basin, London, instanceOf, kinetic bridge]
-
A.
movable bridge
chosen
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
-
B.
tensegrity bridge
A tensegrity bridge is a lightweight, stable structure that uses a network of isolated compression elements (like struts) suspended within a continuous system of tension elements (like cables) to span a distance efficiently.
-
C.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
D.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
E.
multipurpose bridge
A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a5d2b481908a6853cd0138e2d7 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:29 p.m.