Triple
T30645675
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Garden Bridge proposal, London |
E780111
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public garden project |
C12328
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public garden project Context triple: [Garden Bridge proposal, London, instanceOf, public garden project]
-
A.
private garden
A private garden is an enclosed outdoor space owned or controlled by an individual or household, designed and maintained for personal use, recreation, and aesthetic enjoyment.
-
B.
garden design project
chosen
A garden design project is a planned endeavor that organizes and coordinates the creation or transformation of an outdoor space to achieve specific aesthetic, functional, and environmental goals.
-
C.
public garden feature
A public garden feature is a designed element within a shared outdoor space—such as fountains, sculptures, pathways, or plant displays—intended to enhance aesthetic appeal, usability, and community enjoyment.
-
D.
garden space
A garden space is a designated outdoor area intentionally arranged with plants, structures, and pathways to support relaxation, recreation, and aesthetic enjoyment.
-
E.
reconstructed garden
A reconstructed garden is a deliberately restored or re-created outdoor space that revives the design, plantings, and features of a historical or previously existing garden using contemporary materials and interpretation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a5d2b481908a6853cd0138e2d7 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:29 p.m.