Triple

T30645674
Position Surface form Disambiguated ID Type / Status
Subject Garden Bridge proposal, London E780111 entity
Predicate instanceOf P0 FINISHED
Object pedestrian bridge proposal C22890 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian bridge proposal
Context triple: [Garden Bridge proposal, London, instanceOf, pedestrian bridge proposal]
  • A. pedestrian bridge
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • B. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • C. proposed bridge chosen
    A proposed bridge is a planned but not yet constructed structure designed to span a physical obstacle, documented through preliminary designs, locations, and specifications for evaluation and approval.
  • D. urban bridge
    An urban bridge is a man-made elevated structure that spans physical obstacles within a city, such as roads, railways, or waterways, to support the safe and efficient movement of vehicles, pedestrians, and utilities.
  • E. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a5d2b481908a6853cd0138e2d7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:29 p.m.