Triple

T30645673
Position Surface form Disambiguated ID Type / Status
Subject Garden Bridge proposal, London E780111 entity
Predicate instanceOf P0 FINISHED
Object cancelled infrastructure project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cancelled infrastructure project
Context triple: [Garden Bridge proposal, London, instanceOf, cancelled infrastructure project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. cancelled launch vehicle
    A cancelled launch vehicle is a rocket or spacecraft design whose development or deployment was terminated before it could enter regular operational service.
  • C. cancelled product
    A cancelled product is an item or service that was planned or in development but officially discontinued before or shortly after reaching the market.
  • D. unfinished building project
    An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
  • E. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a5d2b481908a6853cd0138e2d7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:29 p.m.