Triple
T30614718
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chiwetel Ejiofor as Solomon Northup |
E779282
|
entity |
| Predicate | characterStatusAtEnd |
P83430
|
FINISHED |
| Object | restored to freedom |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: restored to freedom | Statement: [Chiwetel Ejiofor as Solomon Northup, characterStatusAtEnd, restored to freedom]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: characterStatusAtEnd Context triple: [Chiwetel Ejiofor as Solomon Northup, characterStatusAtEnd, restored to freedom]
-
A.
statusAtEndOfFilm
chosen
Indicates the condition or situation an entity is in when the film concludes.
-
B.
statusAtEndOfNovel
Indicates the final state or condition of an entity as it stands at the conclusion of the novel.
-
C.
statusAfterEvents
Indicates the resulting status or condition of an entity after one or more specified events have occurred.
-
D.
statusInFinale
Indicates the role, condition, or outcome an entity has specifically in the final episode or concluding segment of a series or event.
-
E.
politicalStatusAtEnd
Indicates the political status or condition an entity holds at the conclusion of a specified event or time period.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a3307081909a6dca8ca75dbf48 |
completed | April 29, 2026, 3:32 p.m. |
| NER | Named-entity recognition | batch_69fdfbafe32081909c62653ff4fc155c |
completed | May 8, 2026, 3:05 p.m. |
| PD | Predicate disambiguation | batch_69fdf64db4a881908f8250e24ae3cefb |
completed | May 8, 2026, 2:42 p.m. |
Created at: April 29, 2026, 8:26 p.m.